Specifications

Temp to long-term. Low to heavy traffic.

A range of different materials and designs allows us to create perfect parking solutions for your specific needs.

Event parking, overflow, vehicle storage

Rollpark rolled directly atop well-draining stabilized grass, dirt or in concert with a geogrid for further stabilization.

Preparation

Site is graded to a stabilized subgrade before geotextile filter layer, base course and cement stabilized sand is added.

Fixation

Perimeter anchored by curb anchor. Every 70 feet anchored by cement trough. Asphalt approach anchor.

Fixation pins
Grass or dirt
Rollpark

Daily, temporary use 1-3 years

Rollpark rolled directly atop well-draining stabilized grass, dirt or in concert with a geogrid for further stabilization.

Preparation

Site is graded to a stabilized subgrade before geotextile filter layer, base course and cement stabilized sand is added.

Fixation

Perimeter anchored by curb anchor. Every 70 feet anchored by cement trough. Asphalt approach anchor.

Curb anchor
Fines
Base course
Rollpark

Daily, long term use 4-10 years

Rollpark rolled directly atop well-draining stabilized grass, dirt or in concert with a geogrid for further stabilization.

Preparation

Site is graded to a stabilized subgrade before geotextile filter layer, base course and cement stabilized sand is added.

Fixation

Perimeter anchored by curb anchor. Every 70 feet anchored by cement trough. Asphalt approach anchor.

Curb anchor
Fines
Base course
Filter geotextile
Rollpark
Specifications
2018

Specification Booklet

Get the detailed specifications in a PDF booklet

Rollable permeable paving surface. Durable and environmentally-friendly.

Soft spots can be identified after rainfall has been given sufficient time to drain. They’ll have a muddy composition, like this.

  1. Rollpark surface
  2. Compacted backfill
  3. Anchoring pin
  4. Reinforcing bar
  5. Double tongue and groove interlock
  1. Rollpark surface
  2. Compacted backfill
  3. Anchoring pin
  4. Reinforcing bar
  5. Double tongue and groove interlock
  1. Rollpark surface
  2. Aggregated base
  3. Concrete rebar
  4. Cocrete approach
  5. Redwood
  1. Rollpark surface
  2. Concrete fill
  3. Aggregated base
  4. Compacted earth